UtilFlow

Concrete Calculator

Estimate how much concrete your project needs: cubic yards and cubic feet for slabs, footings, columns, and steps, plus 40/50/60/80-lb bag counts and a ready-mix cost estimate with adjustable waste factor and price per yard. Switch to metric units anytime.

1. Choose a shape and enter dimensions

Pick slab, footing, column, or steps, then enter length, width, and thickness in feet and inches.

2. Review volume, bags, and cost

See cubic yards and cubic feet with your waste factor, 80-lb and 60-lb bag counts, and a cost estimate at your local price per yard.

3. Copy your materials list

Copy the estimate to take to the store or send to your contractor.

Your estimate
1.30
cubic yards (0.99 m³)
$181
est. cost
117
40-lb bags
94
50-lb bags
78
60-lb bags
59
80-lb bags

35.0 cu ft including 5% waste · bag yields ≈ 0.30 / 0.375 / 0.45 / 0.60 cu ft · 1 yd³ = 27 cu ft = 0.765 m³

Related tools

Useful next steps

How concrete volume is calculated

Volume in cubic feet is length × width × thickness with all dimensions in feet. Divide cubic feet by 27 to get cubic yards, because one cubic yard equals 27 cubic feet. For round columns and piers, use π × radius² × depth. Stair volume is the sum of each step treated as a box: width × riser height × tread depth × number of steps. Add a 5–10% waste factor for spillage, uneven subgrade, and over-excavation.

Bag math: 80lb vs 60lb bags

An 80-lb bag of premixed concrete yields about 0.6 cubic feet, and a 60-lb bag yields about 0.45 cubic feet. Divide your total cubic feet (including waste) by the yield per bag and round up — you cannot buy a fraction of a bag. As a rule of thumb, one cubic yard needs 45 eighty-pound bags or 60 sixty-pound bags.

Ready-mix vs bags: the break-even point

Bagged concrete makes sense below roughly 1–2 cubic yards, where the convenience outweighs the higher per-yard cost and the labor of mixing. Above that, ready-mix delivery is cheaper per yard and gives a more consistent mix. Note that most suppliers charge a short-load fee for orders under about 4 cubic yards, so compare the delivered price, not just the per-yard rate.

Concrete Calculator FAQ

How many 80lb bags of concrete are in a cubic yard?

One cubic yard (27 cubic feet) needs about 45 eighty-pound bags, since each bag yields roughly 0.6 cubic feet. Always round up and add 5–10% for waste.

How thick should a concrete slab be?

Use 4 inches for walkways and patios, and 6 inches for driveways that carry vehicles. Place the slab on 4 inches of compacted gravel for drainage and frost protection.

How much does a cubic yard of concrete cost?

Ready-mix concrete typically runs $140–$180 per cubic yard in 2026, varying by region and mix. Bagged concrete costs about $5–$7 per 80-lb bag, which is economical only for small pours.

Should I order extra concrete for waste?

Yes. Add 5% for simple flat work and 10% for uneven subgrades, complex forms, or deep footings. Running short mid-pour creates a cold joint that weakens the slab.

Can I use metric units?

Yes. Tap the ft/in button above the inputs to switch to meters and centimeters — volumes show in cubic meters with cubic yards in parentheses, and bag counts stay the same.

What is the next step after calculating concrete?

Most slabs need a 4-inch compacted gravel base underneath. The “What's next” card below your result carries your slab dimensions into the gravel calculator automatically, so you don't re-enter anything.

Where can I get a detailed cost breakdown?

Use the “What's next” card below your result to open the concrete cost calculator — your cubic yards carry over, and it compares ready-mix vs bagged concrete with delivery fees, short-load charges, and optional labor.